HC Board Minutes Nov 4 2026
Hayley Common Board Meeting
Executive Meeting Only
Date: Nov 4th 6pm
TC Energy Centre – second floor boardroom
In Attendance: Evan Race, Patrick Lyttle, Ken Jennings, Rae-Lynn Rempel (recording secretary)
Absent: Kristine McCallum, Treasurer
Guest: Aaron Alblas, Prospect Management
Agenda:
1. Call to order – Quorum Validated – 6:04 PM
2. Review of previous minutes - reviewed and accepted
3. President’s Report –
4. Treasurer’s Report + Monthly financials (review of latest financials and Budget to actual review) – Evan provided report
a. Late invoice to Midwest Fencing – invoice needs to be paid as it past 90 days. Prospect Management to provide payment immediately.
5. Parking Report – Report by Patrick – nothing to report as visitor spots are still being used for garage owners
6. Maintenance Report - List sent out to Board and MALS
Old Business (30 min)
7. Handyman – Update from Prospect – Local Handyman was to fix light post – not yet completed. Evan has asked for a report of what they can complete from our maintenance list. Aaron will contact them.
8. Expired Smoke alarms – What is to be done regarding the Inspection of noted 266 smoke alarms that were out of date. Aaron will check with Local Handyman to see if they will be able to do the installation and at what cost. Aaron will send out a notice to all residents including the information on the specific detectors that need to be installed and deadline date they need to be installed. Residents will be given a choice to hire Local Handyman for installation. All smoke alarms must be changed by December 31, 2026.
9. Garage 40 MPI damage / claim – Update from Prospect, Work to start someday Nov 1st to 7th – work started Nov 4, 2024.
10.Parking stall 182 – 183 (Visitor) Damage- Work to start Nov 10th
11.Intercom Labels for each building - g – Have prospect make and install labels on each intercom screen (A- unit 1 to 16 with instructions how to use) – Completed
12.Snow Clearing Company – The board has accepted Green Rock civil proposal @ $5,000. – plus, GST a month
13.Reserve fund study –Approved and set to start Sept 23rd – Still waiting on reserve fund study report to be completed.
New Business (30 min)
14. Poles, cracks on drive areas / Parking spaces – Discussion / Plan to get quotes? Funds for this repair to be used out of the operating fund in budget. Prospect will investigation quotes from companies, for work to be completed in spring of 2027.
· Need an electrician to look at list of items
a) Building A highway side upward facing right side light not working
b) Garage 28 outside light (overhead door)
c) garage 40 outside light (man door)
d) sensor for garage 30 to 40 lights
e) building C highway side upward facing lights at entrance
f) Light sensor for lamp posts between F and G
g) Light sensor on lamp post between D and E garage side falling off.
Prospect to send in quotes for all the work – Prospect still working on it.
· Monthly Email newsletter – What to include? To be sent out by Nov 13, 2026
o Hallway clear
o Trash must be taken off balcony
o Insurance savings this year is $25,633
o Snow Clearing will be done by Green Rock.
o Please ensure doors are properly closed during the winter months.
o Reminder of smoke alarms
“IN CAMERA”
Item A – Unit 55 –
· Item B – Roof Issues
· Item C – Reserve fund
“BOARD DISCUSSION”
· Rule / Bylaw suggestion on replacing water heaters at 10-year mark.
· Electric vehicles Issue / Bylaws – Start discussion make plan to start moving forward on.
“PARK IT”
· No Smoking By-Law – How to start approaching this? Start December
· Stucco Quotes – Waiting on for Spring 2027 due to budget and needing more quotes
· Extra Garage downspout flex mesh extensions that garage owners requested at meeting – Ordered and should be in soon will install next spring as winter is almost here
Comments